D1.D Drainage and water quality


    Objective

  • To ensure development does not impact on water quality. 

Control

D1.7 For up to and including the 1% Annual Exceedance Probability (AEP) flood event, on-site infiltration is required in stormwater requirement areas where there is no legal discharge point in the catchment.

Note

This applies to all of the land south of the highway on Figure 51.